精品欧美成人高清在线观看,公交车上操美女,久久电影网午夜鲁丝片免费 Installing Grafoil Crinkle Gasket Tape

精品人妻无码一区二区三区伊人直播,学生妹av,国产精品国产高清国产av,噼里啪啦国语高清

DONDE SEAL

CHINA

Professional Of Mechanical Packing & Industrial Gasket

  Home About Us Products Technology Equipment Contact Us English Version 中文版  

How to install the gland packing?

How to cut gasket material?

How to choose spiral wound gasket?

Take a stand with your packing gland

How to install grafoil crinkle gasket tape?

Choose the right gasket

Why there is packing failure?

Spiral wound gasket production process

Graphite cut gasket

Installation and Maintenance Tips

Why Gaskets Are Used?

Installation instructions for gaskets

Effecting a Seal

Gasket Seating

Forces Acting on a Gasketed Joint

Sample Gasket Application Problem
Troubleshooting Leaking Joints
Gasket material
Mica Gasket material
Non-Asbestos Gasket Material
Methods or techniques of sheet metal working
   
   
   
   

Installing Grafoil Crinkle Gasket Tape

1. Brush off any rust or foreign particles. Wipe flange surface thoroughly with a rag soaked in acetone or other suitable solvent to remove grease or oil.

2. Insert fingernail between the paper backing strip and the tape and strip the paper back three to six inches. Draw a reference line in flange and press squared off end of tape against it.

3. Now, start laying the tape along the face of the flange, peeling the paper backing as you go. To prevent the adhesive surfaces of the tape from doubling back on themselves and sticking together, strip away only a few inches of paper at a time.

4. When the starting point has been reached, lap the tape not more than 1/16 inch and cut with a sharp blade.

5. If wrinkles appear because of improper installation, the may be rolled out with a length of pipe.

For Multiple Thickness Gasket, Add Steps 6, 7 and 8

6. When the starting point has been reached, do not cut the tape. Roll out the tape already laid down using a short length of smooth pipe to iron out the wrinkles.

7. Now, repeat step 3. Be sure that the top layer is positioned exactly above the first layer before contact is made. Once the adhesive touches the tape, it is impossible to separate the layers without tearing them.

8. Repeat steps 6 and 7, depending on the number of layers of tape to be laid down. Finish with steps 4 and 5.

>>The End>>

浙ICP備09001215   Copyright:CIXI ZONDE SEALING & GASKET CO.,LTD.
Address:Ximenwai Industrial District,Longshan Town,Cixi,Ningbo City,China.
Tel:+86-574-63787875, 63787080 Fax:+86-574-63787241 
E-mail: mgr@chinaseal.cn; wangbo@chinaseal.cn
主站蜘蛛池模板: 工布江达县| 平凉市| 玛沁县| 汤原县| 梅州市| 奉化市| 应城市| 荥经县| 类乌齐县| 双城市| 文成县| 沂水县| 临桂县| 邛崃市| 台南县| 磴口县| 雅江县| 大方县| 六枝特区| 九龙坡区| 榕江县| 麻城市| 阿拉善左旗| 涟水县| 金山区| 方山县| 澳门| 安阳市| 邛崃市| 黑龙江省| 舟山市| 廊坊市| 青河县| 蓬安县| 湖南省| 高碑店市| 剑川县| 莱州市| 南汇区| 福贡县| 富阳市|